Debt cycle clock · measured, not scheduled

What stage, what next, and when it starts

Readings as of 2026-11-21 · Sovereign Stress Index 4.9 (watch) · pressure 0.47
Stage now
1 - Liquidity squeeze
Next stage
2 - Breaking point / pivot
Most likely start
Oct 2027
P(within 12 months)
55%

Where we are

Stage is derived from the readings below. It is never assigned from a calendar or an expectation.

0Calm
1Liquidity squeezeYOU ARE HERE
2Breaking point / pivot
3Monetisation

Stage 1 — Liquidity squeeze. 1 corridor(s) broken, none of them core plumbing: Fed primary credit. Broken right now: Fed primary credit.

The plumbing lines — MOVE, credit spreads, repo, auction demand — are what precede a policy pivot. The fiscal line is already far advanced and is tracked separately below, because debt arithmetic forces a pivot eventually while the plumbing decides when.

When Stage 2 (the break and the pivot) starts

Probability that Stage 2 has begun by that month. Three pressure paths are run, so this is a band: the flat grey lines are "pressure does not worsen" and "pressure worsens faster".

Most likely start: Oct 2027  ·  P(within 3 months) 16%  ·  6 months 31%  ·  12 months 55%  ·  18 months 75%

At 12 months the band runs 33% to 77%. Ten percent is reached by Jan 2027; ninety percent by beyond 18 months.

Sensitivity to the count that drives it: with one corridor less broken, 12 months reads 31%; with one more, 79%. Today's count is 1.70 effective broken corridors — one broken outright plus partial credit for the two sitting within a quarter of firing.

0%25%50%75%100%Dec '26Mar '27Jun '27Sep '27Dec '27Mar '28May '28median Oct 2027
central (+0.15 pressure over 12 months) optimistic / pessimistic band
Dec 20265%h 6.5%/mo
Jan 202710%h 6.7%/mo
Feb 202716%h 7.0%/mo
Mar 202721%h 7.3%/mo
Apr 202726%h 7.7%/mo
May 202731%h 8.0%/mo
Jun 202736%h 8.4%/mo
Jul 202740%h 8.7%/mo
Aug 202744%h 9.1%/mo
Sep 202748%h 9.5%/mo
Oct 202752%h 9.9%/mo
Nov 202755%h 10.4%/mo
Dec 202759%h 10.8%/mo
Jan 202862%h 11.3%/mo
Feb 202865%h 11.8%/mo
Mar 202869%h 12.3%/mo
Apr 202872%h 12.9%/mo
May 202875%h 13.5%/mo

The eleven corridors

Each line shows how far it has travelled from calm (0%) toward its firing level (100%). plumbing marks the six that constitute an actual plumbing failure.

MOVE bond volatility plumbing
106.31indexfires >130
implied vol on Treasury options - the price of not knowing what bonds are worth
US high-yield OAS plumbing
3.52%fires >5
the average junk borrower's premium over Treasuries
CCC-and-lower OAS plumbing
13.61%fires >15
the bottom of the credit stack - the honest part of the index
SOFR minus IORB plumbing
1bpfires >15
overnight cash scarcity; a positive spike means dealers ran out of balance sheet
Indirect bidder share plumbing
71.5%fires <60
foreign official appetite at auction
Auction bid-to-cover plumbing
2.46xfires <2.1
dealer indigestion - how much paper they had to eat
Japan 30y JGB
4.03%fires >4.5
the external flank; a JGB dislocation exports a dollar squeeze
Fed primary credit
9358$mnfires >5000
the discount window already in use - the plumbing being used, not stressed
VIX term structure
1.05ratiofires >1.15
front-end panic versus calm contango
Financial CP minus 3m bill
7bpfires >40
bank short-term funding stress
2s10s curve
0.29ppfires >1.7
curve shape; a rapid bull-steepening is the market pricing emergency cuts

The fiscal clock — the part already advanced

net interest reaches 22.0% of federal receipts — 2027 / 2028 / 2031 (p10 / median / p90 of 20,000 simulated paths). Today: 21.94%.

This is a simulated crossing date from the dated-band model, not a market reading. It says when interest cost becomes unpayable out of revenue, which is what forces monetisation in the end — but it does not say the plumbing breaks first.

After the break: monetisation

Once a facility is created, the probability that the balance sheet is expanding within twelve months is 80%. 4 of the 5 post-facility episodes in the calibration table expanded the balance sheet within a year; 2011 used Operation Twist instead of QE.

Why the model is shaped this way — the calibration

Time from the first plumbing break to the first actual Fed facility, in six real episodes. This range — one day to fifteen months — is why the hazard is convex: before the plumbing breaks there is no clock on a pivot; after it breaks, the pivot is usually weeks away.

Sep 2019 repo spike
SOFR spiked to 10% on 17 Sep → NY Fed repo operations, same week
~1 day
Mar 2023 SVB
SIVB failed 10 Mar → BTFP announced 12 Mar
~3 days
Mar 2020 covid
credit spreads blew out from 24 Feb → CPFF/PDCF/QE 17-23 Mar
~4 weeks
Aug 2011 downgrade
US downgraded 5 Aug → Operation Twist 21 Sep
~6 weeks
Jan 2019 pivot
credit spreads + equities broke Dec 2018 → Fed 'patient' 30 Jan 2019
~1 month
Aug 2007 -> Nov 2008
BNP froze funds 9 Aug 2007 → QE1 25 Nov 2008
~15 months
How the number is calculated

Pressure is mean of (value - calm)/(fire - calm) across the 11 corridors, clipped to 0..1.5 - published for reading the tape, NOT used as the hazard's input (a mean of distances reads calm markets as stressed). The monthly hazard is break hazard h = 0.0190 * 2^B, where B = sum of broken corridors (1.5 each if plumbing, 1.0 otherwise, 0.5 if within 25% of firing, 0.25 if within 50%). Today B = 1.70, which gives a median of about 36 months at zero pressure and about 1.6 months at full pressure. Cumulative probability is 1 − ∏(1 − h) over the months shown.

The hazard constants are pinned to the six episodes above, not fitted to a mood. The three pressure paths exist so the output is a band rather than a promise.

What would break this model: a pivot with no corridor ever broken — that has happened for political reasons (Jan 2019) and would show up here as a miss, which is worth knowing. Or two corridors broken for six months with no facility, which would say the convexity is too aggressive.